Company conducted re-processing and re-interpretation of seismic and geophysical data during 2009-2012. According to results of seismic using 3D method were identified perspectives of drilling the well # 116-A Bilousivska. The well # 116-A Bilousivska OGCF was drilled in the period from August 2009 to May 2010 with target depth of 4428m TD and where was tested a number of productive formations from T-1 to B-20.
In accordance with license liabilities of North Yablunivska Area the company was drilled exploration directional well # 203-A with target depth of 4950m TD. The well has been achieved and successfully tested the productive formation of B-22 horizon. At this time the well is producing from this production horizon.
The drilling of development well # 9-A Bilousivska was started at the end of 3rd quarter of 2013. The well has been achieved a target depth of 3990m TD in November 2013. According to drilling data was conducted a clarifications for border of B-20l productive formation and geological structure of Bilousivske OGCF in this locality through Upper Visean sediments area. The company planned to drill a lateral hole from existing well # 9-A in the north-east line based on analysis in order to enter the B-20l productive formation and bring this pay zone to commercial development.